Skip to main content

Resource Center

About American Hydrotech
Not logged in. Login

Project Details

United States Census Bureau Headquarters

Location: Suitland, MD
Completion Date: 2006
Size: 222,000 sqft.
Market Sector: Civic / Government
New Construction: Yes

Project Team

Owner: General Services Administration
Architect: Skidmore, Owings & Merrill LLP
Contractor: Skanska USA Building, Inc.

Product Info

Garden Roof Type: Extensive

Additional Details

The new U.S. Census Bureau Headquarters, located approximately six miles from Washington, D.C., at Suitland Federal Center, is a state-of-the-art facility that will provide a world-class workplace for 6,000 of “America’s Fact Finders”. The census complex is one of the most impressive buildings in the General Services Administration’s (GSA’s) portfolio, and it is not short on green space, either. The complex consists of two interconnected buildings that curve over and around a garden courtyard; plus the facility features a formal entry garden. And higher up – four and five stories up – sit two green roofs that together encompass more than 80,000 square feet of green space.

The GSA desired for the complex to have an environmentally advanced design, and to be designed and built in anticipation of receiving a Leadership in Energy in Environmental Design (LEED) silver rating. The two extensive green roofs, each with a planting depth of approximately 4-inches, reduce the amount of storm water management needed on-site, and contribute to a significant amount of energy efficiency. Hydrotech’s Garden Roof® Assembly was specified for this highly important project, due to its proven performance.


The Garden Roof Assembly consists of MM6125®EV-FR fabric-reinforced, hot fluid-applied, rubberized asphalt waterproof membrane, moisture retention/drainage elements along with Hydrotech’s LiteTop® Growing Media. The

assembly allowed the project designers to successfully transform the roofs into self-sustaining landscaped ecosystems requiring minimal maintenance. MM6125EV was also specified to create a seamless waterproof membrane onto the 127,000 square-foot roof of the adjoining parking garage.

Additional Civic / Government Projects

Vancouver Public Library - Central Branch
Vancouver Public Library - Central Branch
Texas State Capitol
Texas State Capitol
Ohio State House Renovation
Ohio State House Renovation
Wisconsin State Capitol Renovation
Wisconsin State Capitol Renovation
National 9/11 Memorial and Museum
National 9/11 Memorial and Museum
Ballard Library
Ballard Library
Old State Capitol Renovation
Old State Capitol Renovation
National World War II Memorial
National World War II Memorial
Utah State Capital Renovation
Utah State Capital Renovation
Lincoln Tomb Renovation
Lincoln Tomb Renovation
U.S. Capitol
U.S. Capitol
U.S. Air Force - Arnold Hall
U.S. Air Force - Arnold Hall
Denver Justice Center
Denver Justice Center
The Pentagon Renovation
The Pentagon Renovation
Tri-City Wastewater
Tri-City Wastewater
Austin City Hall
Austin City Hall
Warrior Transition Unit
Warrior Transition Unit
Chicago Fire Engine Company 109
Chicago Fire Engine Company 109
Fountaindale Public Library
Fountaindale Public Library
Edith Green - Wendell Wyatt
Edith Green - Wendell Wyatt
Édifice Normand-Maurice - 740 Bel-Air
Édifice Normand-Maurice - 740 Bel-Air
Embassy of the United States of America
Embassy of the United States of America
Halifax Central Library
Halifax Central Library
Heber M. Wells
Heber M. Wells
James Michael Flaherty Building
James Michael Flaherty Building
The Liberty Memorial Museum of World War One
The Liberty Memorial Museum of World War One
United States Census Bureau Headquarters
United States Census Bureau Headquarters
Pine Creek Waste Water Treatment Plant
Pine Creek Waste Water Treatment Plant
O'Hare ConRAC & ATS Extension
O'Hare ConRAC & ATS Extension