Centre hospitalier de l'université de Montréal – (CHUM)
Centre hospitalier de l'université de Montréal – (CHUM)
Montreal
Quebec
Date de fin des travaux
2017
Dimension
225,000 pi. ca.
Garden Roof Assembly
Roofing
Waterproofing
Garden Roof Assembly
Roofing
Waterproofing
Prix
LEED NC Silver aimed
Type de projet
Nouvelle construction
Region
Canada
Market
Santé
Propriétaire
Centre hospitalier de l'Universite de Montreal
Architecte
Cannon Design
NEUF Architectes P
PPP
Entrepreneur
Construction Sante Montreal (OHL and Laing O'Rourke)
IMPERCO, a specialized contractor, successfully waterproofed 216,000 sq. ft. of the project's slabs, terraces, and foundation walls. Couverture Montreal Nord waterproofed the 11,600 sq. ft roof, which is now covered by terraces. They also waterproofed the 8th and 10th floor, which feature vegetated areas totaling 3,500 sq. ft.
Monolithic Membrane 6125 has been used on most hospital projects in the Montreal area.