Heber M. Wells
Heber M. Wells
Salt Lake City
Utah
Date de fin des travaux
2005
Dimension
106,000 pi. ca.
Ultimate Assembly
Waterproofing
Ultimate Assembly
Waterproofing
Type de projet
Nouvelle construction
Réfection
Propriétaire
State of Utah
Architecte
HFS Architects
Entrepreneur
McCullough Engineering and Contracting
In 1983 American Hydrotech was chosen to waterproof 55,000 sqft. of plaza in addition to 24,000 sqft. of vertical foundation.
In a 2005 renovation, over 27,000 sqft. of American Hydrotech's Ultimate AssemblyⓇ featuring Hanover Tennessee Flagstone and Limestone Gray Pavers was installed to update the look of the plaza.